Follow us :

The Shipment--PP Pipe Fittings Moulds

time2018/09/12

After many Trial of the PP pipe fittings moulds, we deliver the goods within 60 days of delivery. Installing the locking plate before the die is shipped, in order to prevent the important parts of the die from biting each other during transportation, causing the loss of the notch or guiding parts.
The Shipment--PP Pipe Fittings Moulds
After many  Trial of the PP pipe fittings moulds, we deliver the goods within 60 days of delivery. Installing the locking plate before the die is shipped, in order to prevent the important parts of the die from biting each other during transportation, causing the loss of the notch or guiding parts.
In industrial production, moulds and tools are used to obtain the required products by injection molding, blow molding, extrusion, die casting or forging, smelting, stamping and other methods.
In short, a mold is a tool used to shape objects. This tool consists of various parts. Different molds are made of different parts. It mainly realizes the processing of the shape of the articles by changing the physical state of the formed material. Known as the "mother of industry".
Mould transportation
一.pay attention to rust prevention. Long distance operations need to be sprayed with rust inhibitor, and large bags are used to wrap the mold and draw out the air.

二.pay attention to packing. There are also many protrusions on the outside of the mold.

三.after the mold, and the mold safety device must be fixed, the mode of moving fixed mold in the transport process, open, collision;

四.spare parts or spare parts should be individually packed in boxes and not placed in a package with the mold itself. Put together, there is risk of bumping in transportation.