Sewer pipe fitting mould testing on injection moulding machine, PP, flaring head, 50mm Skew tee 45, 2 cavity
The sewer pipe fitting mould testing on CHENHSONG injection moulding machine, PP, flaring head, 50mm Skew tee 45, 2 cavity.
The second test of the sewer pipe fitting mould, found the flash problem and solved it in time. 
PP pipe is characterized by no corrosion, wear resistance, non-scaling, reducing vibration and noise, anti-freeze cracking, anti-condensation, less heat loss, simple installation, long service life.
The utility model is composed of a skeleton, a tee body, a sleeve and a flange of a socket. The skeleton is a solid or half-shaped entity made according to different modeling methods and the required pipe shape and specifications.
The Second Testing For Mould
After the mold design and manufacture, the mold must be repeatedly tested to ensure accurate injection molding, and to meet customer needs.The flash problem found in this testing is also perfectly solved.