Fifteen suggestions for operation and maintenance of injection molds(2)

   五、Before each mould clamping, it should be noted that whether the cavity is cleaned or not, no residual products or any foreign objects are allowed. It is strictly forbidden to use hard tools during cleaning to prevent the surface of the cavity from being damaged.

 

    六、For moulds with special requirements on the surface of the cavity, if the surface roughness is less than or equal to 0.2cm, it must not be wiped by hand or cotton.

It should be blown with compressed air or lightly wiped with high-grade napkins and high-grade decreased cotton with alcohol.

 

    七、 The surface of the cavity should be cleaned regularly.Injection moulds often decompose into low molecular compounds to corrode the mould cavity in the process of moulding, which makes the bright surface of the mould cavity gradually dim and dull and reduces the quality of products. Therefore, regular scrubbing is needed. After scrubbing with alcohol or Keaton preparations, it is necessary to blow dry in time.

    八、When the operation needs temporary shutdown, the mould should be closed and the cavity and core should not be exposed to prevent accidental damage.When the shutdown time is expected to exceed 24 hours, rust-proof oil or demolishing agent should be sprayed on the surface of the cavity and cor.

 

    Especially in wet areas and rainy season, no matter how short the shutdown time is, it also needs to be rust-proof treatment.

 Water vapor in the air will reduce the surface quality of the mould cavity and the products.

When the mould is used again, the oil on the surface should be removed and wiped clean before use. The mould required by the mirror surface should be cleaned and dried compressed air and then dried with hot air. Otherwise, it will ooze out during molding and cause defects in the product.

    九、Turn on after temporary shutdown. After opening the die, check whether the slider limit is moved or not. Only when no abnormality is found, can the die be closed. In a word, we must be cautious and not careless before starting the machine.

          

    十、 In order to prolong the service life of the cooling water channel, when the die is stopped, the water in the cooling water channel should be removed immediately with compressed air, a small amount of oil should be put into the nozzle, and then blown with compressed air, so that all the cooling pipes have a layer of rust-proof oil.

    十一、 In the work, it is very important to carefully check the working status of each control part, strictly prevent the abnormality of the auxiliary system, heating and maintenance of the control system for the hot runner die. At the end of each production cycle, the rod heater, belt heater and thermonuclear should be measured, and compared with the technical specifications of the die to ensure the integrity of its functions. At the same time, the control loop may pass the ammeter test installed in the loop. The oil in the hydraulic cylinder used for core pulling is emptied as far as possible and the oil nozzle is sealed so as to avoid leakage of the hydraulic oil or pollution of the surrounding environment during storage and transportation.

    十二、In the work, it is very important to carefully check the working status of each control part, strictly prevent the abnormality of the auxiliary system, heating and maintenance of the control system for the hot runner die. At the end of each production cycle, the rod heater, belt heater and thermonuclear should be measured, and compared with the technical specifications of the die to ensure the integrity of its functions. At the same time, the control loop may pass the ammeter test installed in the loop. The oil in the hydraulic cylinder used for core pulling is emptied as far as possible and the oil nozzle is sealed so as to avoid leakage of the hydraulic oil or pollution of the surrounding environment during storage and transportation.

 

    十三、Operators in the handover, in addition to the handover of production, process critical records, the use of the mold also need to have a detailed account.

 

    十四、 When the mold is finished, the mold should be coated with antitrust agent when the machine is replaced, and the mold accessories should be sent to the mould maintenance worker. The product with the last mould can be delivered to the maintenance personnel as a sample. In addition, a list of the use of the mould should be sent to fill in the details of which machine tool the mould is on and how many products are produced from a certain date in a certain year, month and day, and whether the mould is in good condition now. If there is any problem in the mold, it is necessary to fill in the mould on the use sheet, put forward the specific requirements for modification and improvement, and hand over a sample of the unfinished sample to the storekeeper, leaving it to the die maker for reference.

    十五、Mould storehouse should be set up, special person should be set up to manage, and mould files should be set up. If possible, computer management should be carried out on the mould. Mould warehouse should choose a place with low humidity and ventilation. Temperature should be kept below 70%. If humidity exceeds 70%, the mould is easy to rust. Moulds should be stored on shelves. Attention should be paid to corrosion prevention and dust prevention. To mark the need to repair or complete repair, maintenance marks.